Need Student Scheduling Group for Next Year
Trying to schedule for next year and current scheduling groups are causing a conflict, as there will be new groups next year.
Currently STU.SG is designed to be used in Scheduling, but have been using it to reflect what actually is in MST.
Need to separate the functioning by adding a new field (STU.MG) to use with Master Schedule functions, and leave STU.SG to function solely with Scheduling tables.
1
vote
AdminJan Tokorcheck
(Quality Control, Aeries Software)
shared this idea