Scheduling Page Setup Processes
On the Scheduling Setup page, the new option in the initializing of the SMS table confuses the order to use these options:
Do Nothing with the SMS Table, but Copy Flex Periods (FTF)
Blank out the SMS Table
Copy current master schedule (MST) table to the new SMS table.
Blanking out the SMS table does not copy the FTF table, but it does warn that the FTF table for next year will be deleted. Should blanking out the SMS table have an option to NOT delete the FTF table? Or, should the training be done to blank out the SMS table first, then use the Do Nothing with the SMS Table, but Copy Flex Periods (FTF) next?
Copying the MST to SMS does not copy the FTF table, or if it does, that is not indicated. Should there be an option to copy the FTF table at the same time? Without the option to copy the FTF when MST is copied to SMS, then if a school wants to copy their MST table to their SMS table, then they should Blank out the SMS table first. Then should they copy their MST to SMS before they Do Nothing with SMS but Copy the Flex Periods (FTF)?